Whenever I run my render Enscape seems to be chewing through gobs of memory. I'm typically at 70% or more of 64gb of memory by the time I get to my single render.
Would increasing my memory to 128gb or getting significantly faster memory (I'm DDR5 2700mhz) improve Enscape's performance at all (time to render) or is my RTX 4090 doing all the work there? Feels like when I'm waiting for renders I'm just watching the memory slowly get consumed.