View management, I think I found it.
Posts by RudyDeSmedt_Democo
-
-
I want to make favorites in de enscape session. I do that by navigating to the desired view and then 'create 3D view' in Revit to make it favorite. I don't find the create 3D view anymore..?
-
Even when the BIM info is only available in exported exe file, whithout VR glasses would be alreadyan advantage. Off course, in the VR session with glasses and beaming onto objects to see the BIM info is more great.
-
I have multiple projects with surely over 4 GB of rvt file. Enscape export to exe is 1 GB and never had a memory issue.
Rendering on PC 32GB RAM, nvidea RTX generation. Rendering time can be 10-20 min, but that is ok for todays hardware. -
In Revit I use many linked rvt file, where almost all are put on overlay.
https://therevitfairy.wordpres…ones%20linked%20into%20it).So in Revit I don't see the links in the links.
When I render this Revit view in Enscpae I do see the links in the links, with lots of double geometry as consequence.
Someone has the same issue, or solution.
Changing everything in Visibility graphic and set on custom is to much work.